1.0  Background

 

The Macondo wellwas located on Mississippi Canyon block 252 (MC 252). The rig was situated approximately 52 miles off the Louisiana coast in the Gulf of Mexico. BP is the operator of Block 252. Out of the 126-member crew the rig, only seven were BP employees. Anadarko Petroleum and MOEX Offshore were BP’s partners at Macondo. Transocean owned the Deepwater Horizon rig andexecuted the drilling of the Macondo well when it caught fire. The Transocean crews.Halliburton was in charge of the cementing operation. Other contractors and suppliers at Macondo include Schlumberger, Weatherford, Cameron and Dril-Quip ((Offshore Technology, 2018; National Commission Report, 2011).

1.1  The Macondo Incident

 

The BP Deepwater Horizon accident, known as “Macondo Blowout” happened on April 22, 2010. 126-member crew was onboard the rig. BP and Transocean lost control of the well, resulting inan undetected kick, then a blowout – the uncontrolled influx of formation fluids (oil and gas) from the well to the surface. A sudden explosion and fire occurred on the rig leading to the deaths of 11 workers, severe physical injuries to 17 crew members, the sinking of the Ultra-Deepwater Floater Deepwater Horizon (U.S. Chemical Safety Board, 2016).Approximately 4 million barrels of crude oil were spilled into the Gulf of Mexico of which 810,000 barrels were collected at the wellhead (United States District Court Eastern District of Louisiana, 2016).

2.0  Process

 

This research reviews variety of reports written by professionals within the industry, official investigations and perspectives regarding the Macondo incident. These reports include those by the:

· National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling. Report to the President. January 2011

· Deepwater Horizon Study Group, BP

· U.S. Chemical Safety and Hazard Investigation Board

3.0  Findings and Conclusion 

 

3.1 Technical Findings

 

· BP and Halliburton crews did a bad cement job. The cement that Halliburton pumped into the well did not seal off the hydrocarbon-bearing formation.

· Some of Halliburton’s internal tests confirmed a poorly designed and unstable cement slurry and raised further concerns.

· BP’s temporary abandonment procedures required rig personnel to underbalance the well before installing additional barriers to reinforce the cement job.

· BP well site leaders and Transocean crew conducted a negative pressure test on April 20. The test indicated that hydrocarbons were leaking into the well, however BP’s well site leader misinterpreted the test, partly as a result of accepting some false theory suggested by some Transocean rig crew. They lost the opportunity to detect the cement failure.

· By the time the crew became aware of what was happening, hydrocarbons had already moved through the riser pipe, past the blowout preventer and were flowing uncontrollably to the rig floor.

· The Transocean crew attempted to activate the rig’s BOP, but it was too late to prevent an explosion.

The BOP can only close and act as a secondary barrier if activated by crew or automatically by a tragic incident, such as an explosion or a fire, which can trigger the emergency response systems.

3.2  Management Findings

 

The technical failures can be traced to a series of BP and Transocean management failures.

· BP did not recognize or address adequately risks initiated by thefrequent changes to well abandonment procedures.The repeated changes to the well plan created a sort of confusions and nuisances among Transocean rig crew and BP employees.

· BP focused on saving cost by reducing rig time and fostering efficiency to the detriment of safety. BP lost track of the associated risks that come as a result of trying to save cost. This reveals a flop in BP’s management process.

· Halliburton seemed negligent in its supervision of work done by its main cementing crew and did not take proactive steps to have profoundly reviewed data that should have necessitated it to redesign the cement slurry.

· Transocean did not communicate critical lessons learnt from a related and recent “near-miss drilling incident” to its employees.

· The Transocean personnel were not adequately trained on responding to emergency situations.

References

British Petroleum.(2010).Deepwater Horizon Accident Investigation Report.

Retrieved from

https://www.bp.com/content/dam/bp/pdf/sustainability/issue-reports/Deepwater_Horizon_Accident_Investigation_Report.pdf

National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling.

(2011a). Deep Water: The Gulf Oil Disaster and the Future of Offshore Drilling. Retrieved from



 DOWNLOAD SAMPLE ANSWER

Details

  • Number of views:
    280
  • PRICE :
    AU$ 320.00
Security Code  
Urgent Assignment Help

Our Top Experts


Karen Betty

Holding a PhD degree in Finance, Dr. John Adams is experienced in assisting students who are in dire need...

55 - Completed Orders


Daphne Lip

Canada, Toronto I have acquired my degree from Campion College at the University of Regina Occuption/Desi...

52 - Completed Orders


Mr Roberto Tuzii

Even since I was a student in Italy I had a passion for languages, in fact I love teaching Italian, and I...

102 - Completed Orders


Harsh Gupta

To work with an organization where I can optimally utilize my knowledge and skills for meeting challenges...

109 - Completed Orders


ARNAB BANERJEE

JOB OBJECTIVE Seeking entry level assignments in Marketing & Business Development with an organization...

202 - Completed Orders


KARAN BHANDARI

Current work profile Project manager- The Researchers Hub (2nd Jan 2016 to presently working) Researc...

20 - Completed Orders


Tan Kumar Ali

Sales Assistant, Mito Marina Assigned to the Stationery dept – assisted in merchandising, stock taking...

100 - Completed Orders


Wesenu Irko

Personal Profile Dedicated and highly experienced private chauffeur. High energy, hardworking, punctua...

200 - Completed Orders


Lizzy Darley

I'm Lizzy, full time education specialist in English, Essay Writing, Economics and Maths. Having Assi...

109 - Completed Orders


CRYSTAL

HSC PREPARATION I specialise in English coaching programs for HSC students. My personalised and results-...

202 - Completed Orders